Home / DAFTAR PENGADAAN DINAS PERKIM TA. 2018

DAFTAR PENGADAAN DINAS PERKIM TA. 2018

NO KEGIATAN MERK /TYPE NO KONTRAK TGL KTRK SATUAN JUMLAH NILAI REAL NAMA CV ALAMAT CV NPWP DIREKTUR
KIB A
1 PEMBEBASAN LAHAN PASAR JELOJOK        2,937,625,000 1                      2,937,625,000
PEMBEBASAN LAHAN PASAR JELOJOK (TAHAP II)        2,202,664,848 1                      2,202,664,848
2  PENATAAN KAWASAN LAND CONSOLIDATION PAKET I 602/02.F/LC1-P4T/PPK-TNH/PERKIM/2018 28/05/2018 CV TUNJUNG TILAH TIWUGALIH KEC. PRAYA LOTENG 662082619915000 LALU NURHAM
PEMBAYARAN UMK             44,933,400 1                           44,933,400
RETENSI               7,488,900 1                             7,488,900
3 HONOR PPK DAN PPBJ               1,900,000 1                             1,900,000
4 PENATAAN KAWASAN LC PAKET II 602/01.F/LC1-P4T/PPK-TNH/PERKIM/2018 28/05/2018 CV MITRA KARYA JEMPONG ELER MERTAK TOMBOK 748110095915000 LALU WELLY VIDI H
PEMBAYARAN 95%           142,238,750 1                         142,238,750
RETENSI               7,486,250 1                             7,486,250
5 PENATAAN KAWASAN LC PAKET I 602/02.F/LC1-P4T/PPK-TNH/PERKIM/2018 28/05/2018             97,355,700 1                           97,355,700 CV TUNJUNG TILAH TIWUGALIH KEC. PRAYA LOTENG 662082619915000 LALU NURHAM
6 PERENCANAAN PENATAAN KAWASAN LC 100 % 602/01.C/PRC-P4T/PPK-TNH/PERKIM/2018 02/04/2018             20,744,000 1                           20,744,000 CV. KEKALIK MULTI CIPTA JL JUPITER RAYA LOBAR 027203256911000 ASEP NORMAN
7 PERNGAWASAN PENATAAN KAWASAN LC 100 %             17,438,000 1                           17,438,000 CV. KEKALIK MULTI CIPTA JL JUPITER RAYA LOBAR 027203256911000 ASEP NORMAN
JUMLAH KIB A                      5,479,874,848
KIB B
1 PENDINGIN RUANGAN ( AC ) LG / T10 EMV 933.1/01/BRG-PPESANAN/DISPERKIMSEKT./2018 2/12/2018               4,994,000 5                           24,970,000 TOKO PRIMADONA JL. JENDERAL SUDIRMAN PRAYA 60603693915000 AGUS ATMAJA
2 LEMARI ARSIP BROTHER  B 304 933.1/02/BRG-PPESANAN/DISPERKIMSEKT./2018 2/12/2018               4,999,500 4                           19,998,000 UD. ALBY JL. MAREJE PANJISARI PRAYA 66173725915000 H. M YUSUF SALEH
3 BRANGKAS TIGER III 933.1/03/BRG-PPESANAN/DISPERKIMSEKT./2018 2/12/2018               9,900,000 1                             9,900,000 TOKO PRIMADONA JL. JENDERAL SUDIRMAN PRAYA 60603693915000 AGUS ATMAJA
4 LASER METER BOSCH E 40 2/13/2018               2,000,000 2                             4,000,000 CV. NIAGA HARDWARE JL. SANDUBAYA MATARAM 809901580911000 HENDRAWAN
5 MEJA RAPAT 933.1/5.b/BRG-PPESANAN/DISPERKIMSEKT./2018 2/9/2018             27,580,000 1                           27,580,000 CV CAHAYA MULYA RIZKY JL BASUKI RAHMAT NO.25 PRAYA 662049667915000 IR. LALU JANWARDI
6 KORDEN KANTOR 602/07.5/PPK-SEK/PPGD/2018 2/12/2018             69,969,000 1                           69,969,000 CV CAHAYA MULYA RIZKY JL BASUKI RAHMAT NO.25 PRAYA 662049667915000 IR. LALU JANWARDI
7 SOUND SYSTEM 933.1/06/BRG-PPESANAN/DISPERKIMSEKT./2018 2/12/2018             34,925,000 1                           34,925,000 UD. LOGICAL MUSIC JL. DANAU KERINCI II NO 1 PAGUTAN 84180868911000 AGUNG SUPARTHA
8 LAPTOP LENOVO V310 933.1/28.1/BRG-PPESANAN/DISPERKIMSEKT./2018 2/22/2018               7,450,000 6                           44,700,000 CV . PAGAH JL RINJANI 8 PRAYA 757419049915000 ZULKIFLI, SP
9 PRINTER A4 EPSON L 360 933.1/29.1/BRG-PPESANAN/DISPERKIMSEKT./2018 2/22/2018               3,450,000 6                           20,700,000 CV . PAGAH JL RINJANI 8 PRAYA 757419049915000 ZULKIFLI, SP
10 ALAT BANTU TAMAN 602/02.5/PPK-BANGKIM/2018 2/20/2018             54,859,000 1                           54,859,000 CV. GIAT JL. YOS SUDARSO NO.17 PRAYA 11128121915000 LALU ISA NAZILA
11 RADIO PEMANCAR DAN HT 602/01.5/PPK-BANGKIM/2018 2/20/2018             49,897,000 1                           49,897,000 CV. GIAT JL. YOS SUDARSO NO.17 PRAYA 11128121915000 LALU ISA NAZILA
12 PRINTER A3 BROTHER MFC 933.1/10/BRG-PPESANAN/DISPERKIMSEKT./2018 3/12/2018               8,470,000 1                             8,470,000 TOKO PRIMADONA JL. JENDERAL SUDIRMAN PRAYA 60603693915000 AGUS ATMAJA
J3520
13 KOMPUTER PC LENOVO AIO 520 933.1/32.1/BRG-PPESANAN/DISPERKIMSEKT./2018 14/04/2018               9,990,000 3                           29,970,000 CV. HELIOS JL. I GUSTI JELANTIK GOSA NO.19 710912650914000 HENDRA MARIONO
ABIAN TUBUH MATARAM
14 MOBIL PICK UP DAIHATSU 602/02.e/PNGD-BKM/PPK-R/PERKIM/2018 01/03/2018           140,450,000 1                         140,450,000 PT. PRIMA PARAMA JL. AA GDE NGURAH NO 68 MATARAM 17841085914000 SANARDI WIJAYA
GRAND MAX MOBILINDO
15 MOBIL SKY LIFT HINO DUTRO 602/01.e/PNGD-BKM/PPK-R/PERKIM/2018 07/02/2018        1,254,627,869 1                      1,254,627,869 PT. BERKAT ANUGRAH JL. TUNJUNGAN NO 57 H SURABAYA 12083903631000 ARIANTO ADINEGORO
130 PS HD RAYA SUGITO
16  ALAT RTK ( REAL TIME KINEMATIC) GPS  GEODETIC GEOMAX ZENNIT 25 PRO 602/01.T/SIP-TNH/PERKIM/2018 11/04/2018           242,000,000 2                         484,000,000 PT. SAITAMA KARYA JL. MASJID AL-KHOIR NO. 145 CILANGKAP JAKARTA TIMUR 29025343009000 RUDI ANTONY SIREGAR
HONOR PPK               3,000,000 1                             3,000,000
17 LCD dan SCREEN PROYEKTOR SONY DX 241 933.1/16/BRG-PPESANAN/DISPERKIMSEKT./2018 02/06/2018               9,955,000 2                           19,910,000 TOKO PRIMADONA JL. JENDERAL SUDIRMAN PRAYA 60603693915000 AGUS ATMAJA
HONOR PPK,PPBJ DAN PPHP               1,200,000 1                             1,200,000
18 SEPEDA MOTOR HONDA 125 CBS 05/PPK-PERKIM/MTR/2018 06/09/2018             19,285,000 5                           96,425,000 PT. ASTRA INTERNASIONAL.TBK-HONDA KOMPLEK PASAR RENTENG PRAYA 13025846914001 WAHYU SAPUTRA SH
HONOR PPK,PPBJ DAN PPHP                  950,000 1                                950,000
19 KURSI KERJA RUSUNAWA NEW STAR 993/243/BRG-PESANAN/DISPERKIM/2018 05/11/2018                  500,000 4                             2,000,000 UD. ALBY JL. MAREJE PANJISARI PRAYA 66173725915000 H. M YUSUF SALEH
20 MEJA KERJA RUSUNAWA ACTIV 993/242/BRG-PESANAN/DISPERKIM/2018 05/11/2018               2,500,000 2                             5,000,000 UD. ALBY JL. MAREJE PANJISARI PRAYA 66173725915000 H. M YUSUF SALEH
21 LEMARI FILLING KABINET BROTHER 993/241/BRG-PESANAN/DISPERKIM/2018 05/11/2018               5,000,000 1                             5,000,000 UD. ALBY JL. MAREJE PANJISARI PRAYA 66173725915000 H. M YUSUF SALEH
22 TANGGA ALUMUNIUM DAN KATROL 993/02/BK/CVB/XI/2018 12/11/2018             12,969,000 1                           12,969,000 CV. BARITO JL GAJAH MADA PRAYA TATIK KASIANI
23 TENDA 993/03/BK/ALGI/XI/2018 12/11/2018             29,920,000 1                           29,920,000 CV. ALGI JL. Akasia No.9 Tampar – ampar 725635403915000 Nurjannah Hirjan
24 PENYEDIAAN DAN PERAWATAN VEGETASI NURSERY FARM           124,950,000 1                         124,950,000 CV IJO GOSE JL. BASUKUI RAHMAT 17 PRAYA 18146100915000 L SAEFUDIN ZOHRI
HONOR PEJABAT PHP               1,000,000 1                             1,000,000
HONOR PANITIA PHP               5,850,000 1                             5,850,000
JUMLAH KIB B                      2,587,189,869
KIB C
1 PEMBANGUNAN GUDANG DAN ARSIP KANTOR 602/26.e-GEDUNG/PPK SEK/2018 29/10/2018 CV.CAHAYAMULYA RIZKY JL. BASUKI RAHMAT 25 MARDE PRAYA 662049667915000 Ir. LALU JANWARDI
UANG MUKA             29,945,700 1                           29,945,700
PEMBAYARAN 65 %             64,882,350 1                           64,882,350
RETENSI 5%               4,990,950 1                             4,990,950
2 RENOVASI GEDUNG KANTOR BANGKIM 602/30.e-GEDUNG/PPK SEK/2018 29/10/2018 CV. RAKINDO ABADI BUMBANG DESA MERTAK PUJUT 8.60643E+14 RAKIB
PEMBAYARAN 95%           180,361,300 1                         180,361,300
RETENSI 5%               9,492,700 1                             9,492,700
3 HONOR PPK,PPBJ DAN PPHP               1,250,000 1                             1,250,000
4 PENATAAN LANSCAPE RUSUNAWA DOLOG 602/16.F/FS-PRM/PPK-R/PERKIM/2018 03/09/2018 CV. IJO GOSE JL. BASUKUI RAHMAT 17 PRAYA 18146100915000 L SAEFUDIN ZOHRI
PEMBAYARAN 95 %           189,772,950 1                         189,772,950
RETENSI 5 %               9,988,050 1                             9,988,050
5 PEMATANGAN DAN PENATAAN LAHAN UNTUK RUSUS BILELANDO 602/032.e/PPK.PERUMAHAN/PERKIM/2018 30/11/2018 CV. SINAR ABADI JL. BASUKUI RAHMAT 95 PRAYA BAIQ RIZKA KANDIYA
PEMBAYARAN 95 %           187,910,000 1                         187,910,000
RETENSI 5 %               9,890,000 1                             9,890,000
6 PEMAGARAN RUSUNAWA NTB I 602/033.e/PPK.PERUMAHAN/PERKIM/2018 30/11/2018 CV. CAHAYA RIYOU ZAFARA JL. BASUKUI RAHMAT  PRAYA 810821785915000 L ZAENUDIN
PEMBAYARAN 95%           142,262,500 1                         142,262,500
RETENSI               7,487,500 1                             7,487,500
7 PEMATANGAN LAPANGAN BOLA DI REMBITAN 602/034e/PPK.PERUMAHAN/PERKIM/2018 30/11/2018 CV. ATAP ABADI BALE MONTONG KAWO AANG RANGGA
PEMABAYARAN 95 %           184,965,000 1                         184,965,000 FIFA
RETENSI               9,735,000 1                             9,735,000
8 PENYIAPAN LAHAN UNTUK RELOKASI SEMENTARA PEDAGANG PSAR RENTENG 602/03.F/BKM/PPK-APBDP/PERKIM/2018 17/11/2018 CV. CAHAYA SINAR ABADI MARDEVPRAYA 881985493915000 BAIQ RIZKA
PEMABAYARAN 95%           188,851,450 1                         188,851,450
RETENSI               9,939,550 1                             9,939,550
9 RELOKASI SEMENTARA PEDAGANG PASAR RENTENG PAKET I 602/07.F/BKM/PPK-APBDP/PERKIM/2018 17/11/2018 CV. UNIQUE NUSANTARA BELEKE PRAYA TIMUR 719266652915000 HARYONO
PEMBAYARAN 95%           127,176,500 1                         127,176,500
RETENSI               6,693,500 1                             6,693,500
10 RELOKASI SEMENTARA PEDAGANG PASAR RENTENG 602/02.F/BKM/PPK-APBDP/PERKIM/2018 17/11/2018 CV. ERA PUTRANGGA SAKTI PERUMNAS PRAYA 15145706915000 HERLAN AFRIADI
PEMBAYARAN 95 %           188,831,500 1                         188,831,500
RETENSI               9,938,500 1                             9,938,500
11 KONSULTAN PERENCANAAN PENATAAN LINGKUNGAN DAN KIOS PASAR RENTENG 602/22.C/PRC-BKM/PPK-R/PERKIM/2018 05-07-201             42,911,000 1                           42,911,000 CV. GRHA PRATAMA INTI BTN BERMIS LENENG PRAYA 31167273915000 AULIA MUTTAQIN, ST
12 KONSULTAN PENGAWASAN PENATAAN LINGKUNGAN DAN RELOKASI KIOS PASAR RENTENG 602/12.C/PWS-BKM/PPK-APBDP/PERKIM/2018 17/11/2018             39,870,000 1                           39,870,000 CV. BANGUN PERSADA CONSULTANT GERUNG LOMBOK BARAT 755940762914000 M. HABIBI, ST
13 PORTAL RTH TASTURA 993/04/BK/AZZ/XII/2018 27/12/2018             20,000,000 1                           20,000,000 CV. AIR ZAM ZAM  JL TREMBESI 9 PERUMNAS M. HIDAYATULLAH
TOTAL KIB C                      1,667,146,000                                 1,667,146,000
KIB  D
1 PENGADAAN METER BARU DARI PASCA BAYAR KE PRABAYAR UNTUK RUSUNAWA NTB I             66,123,800 1                           66,123,800
2 HONOR PEJABAT                  700,000 1                                700,000
PENGADAAN
3 HONOR PEJABAT               1,700,000 1                             1,700,000
PENGADAAN DAN PPHP                                          –
4 KONSULTAN PERENCANAAN 100%  DRAINASE 602/15.C/PRC-BKM/PPK-R/PERKIM/2018 22/03/2018             34,936,000 1                           34,936,000 CV. BINA PELANGI JALAN GILI MENO KARANG BARU 019468198911000 Ir. FARHAN HADI
KONSULTAN MATARAM
5  PENATAAN LAHAN BELAKANG ORIENT 602/03.F/FS-BKM/PPK-R/PERKIM/2018 14/05/2018 CV. HIJRAH SUKSES JL. RAYA BATUNYALA PRAYA 023929813915000 M.IRPAN ANWAR SAID
PEMBAYARAN UMK             59,799,000 1                           59,799,000
PEMBAYARAN 95%           129,564,500 1                         129,564,500
RETENSI               9,966,500 1                             9,966,500
6  PEMBANGUNAN TROTOAR KAWASAN BATUJAI PAKET I 602/01.F/Fs-BKM/PPK-R/PERKIM/2018 24/07/2018 CV. VIVA BANINDO JL BASUKI RAHMAT NO 14 PRAYA 32318883915000 Ahmad Hendri h
PEMBAYARAN UMK             58,600,200 1                           58,600,200
PEMBAYARAN 95 %           126,967,100 1                         126,967,100
RETENSI               9,766,700 1                             9,766,700
7 PEMBANGUNAN TROTOAR KAWASAN BATUJAI PAKET II 602/02.F/Fs-BKM/PPK-R/PERKIM/2018 24/07/2018 CV. SURYA HADIGUNA TANAK AWU LOMBOK TENGAH 76347298915000 BAIQ MARIATUN
PEMBAYARAN 95 %           185,737,350 1                         185,737,350
RETENSI               9,775,650 1                             9,775,650
8 PEMBANGUNAN DRAINASE KAWASAN BATUJAI PAKET I 602/07.F/Fs-BKM/PPK-R/PERKIM/2018 24/07/2018 CV. FADIL BERSAUDARA REMBIGE MATARAM ALFIANA SOFIANA , SE
PEMBAYARAN 95 %           185,991,950 1                         185,991,950
RETENSI               9,789,050 1                             9,789,050
9 PEMBANGUNAN DRAINASE KAWASAN BATUJAI PAKET II 602/08.F/Fs-BKM/PPK-R/PERKIM/2018 24/07/2018 CV. ALFAEZAH
PEMBAYARAN 95 %           185,583,450 1                         185,583,450
RETENSI               9,767,550 1                             9,767,550
11 KONSULTAN PENGAWASAN DRAINASE 602/23.C/PWS-BKM/PPK-R/PERKIM/2018 14/05/2018             31,881,000 1                           31,881,000 CV INDRA UTAMA PERUMNAS AMPENAN 1236695911000 HINDRA UTAMA
12 HONOR PPK DAN PPBJ               2,850,000 1                             2,850,000
13 KONSULTAN PERENCANAAN PENATAAN LINGKUNGAN PAKET II 602/14.C/PRC-BKM/PPK-APBDP/PERKIM/2018 17/11/2018             49,791,000 1                           49,791,000 CV.MERAH PUTIH CONSULTANT REMBIGE MATARAM 85621134604000 DANI KARTER FR, ST
14 PERBAIKAN SISTEM DRAINASE DALAM KOTA PRAYA 602/06.F/BKM/PPK-APBDP/PERKIM/2018 17/11/2018 CV. TUNJUNG TILAH TIWU GALIH PRAYA 6.62083E+14 LALU NURHAM
PEMBAYARAN 95 %           188,841,000 1                         188,841,000
RETENSI               9,939,000 1                             9,939,000
15 PERBAIKAN SALURAN DRAINASEJALAN DIPONEGORO 602/07.F/BKM/PPK-APBDP/PERKIM/2018 17/11/2018 CV. MANGGIH RAHAYU JL. KI HAJAR DEWANTARA PRAYA 748813573915000 L. SYAMSIL UMRI
PEMBAYARAN 95 %           188,850,500 1                         188,850,500
RETENSI               9,939,500 1                             9,939,500
16 REHABILITASI SALURAN DRAINASE JALAN PERKUTUT 602/13.F/BKM/PPK-APBDP/PERKIM/2018 17/11/2018 CV. CAHAYA RIYOU ZAFARA MARDE PRAYA 8.10822E+14 LALU ZAENUDIN
PEMBAYARAN 95%             94,218,150 1                           94,218,150
RETENSI               4,958,850 1                             4,958,850
17 PEMASANGAN TALUD DI DESA AIK BUKAK 602/05.F/BKM/PPK-APBDP/PERKIM/2018 17/11/2018 CV. CAMAR KELURAHAN PRAYA 18143065915000 WAHYU WIYANTI
PEMBAYARAN 95%           188,884,700 1                         188,884,700
RETENSI               9,941,300 1                             9,941,300
18 PEMBANGUNAN DRAINASE JALAN JEMPIRING 602/10.F/BKM/PPK-APBDP/PERKIM/2018 17/11/2018 CV. GIAT JL YOS SUDARSO 17 PRAYA 11128121915000 LALU ISA NAZILA
PEMBAYARAN 95%           188,841,000 1                         188,841,000
RETENSI               9,939,000 1                             9,939,000
19 REHABILITASI SALURAN DRAINASE DI PERUMNAS TAMPAR AMPAR 602/04.F/BKM/PPK-APBDP/PERKIM/2018 17/11/2018 CV. GIAT JL YOS SUDARSO 17 PRAYA 11128121915000 LALU ISA NAZILA
PEMBAYARAN 95%           188,824,850 1                         188,824,850
RETENSI               9,938,150 1                             9,938,150
20 PEMBUKAAN JALAN BARU KUNG-PANDI-TANAK BEAK DESA SUKADANA 602/08.F/BKM/PPK-APBDP/PERKIM/2018 17/11/2018 CV.PELITA RAGIL ARTHA PUJUT LOMBOK TENGAH 723939344915000 KASUP
PEMBAYARAN 95%           187,891,000 1                         187,891,000
RETENSI               9,889,000 1                             9,889,000
21 PENIMBUNAN JALAN MANJUT – GERESEK DESA SUKADANA 602/09.F/BKM/PPK-APBDP/PERKIM/2018 17/11/2018 CV. PELITA RAGIL ARTHA DESA SUKADANA KEC. PUJUT 723939344915000 KASUP
PEMBAYARAN 95%           187,900,500 1                         187,900,500
RETENSI               9,889,500 1                             9,889,500
22 PERBAIKAN JALAN TALON AMBON KECAMATAN BATUKLIANG 602/12.F/BKM/PPK-APBDP/PERKIM/2018 17/11/2018 CV. SAKINA TIWUGALIH PRAYA 23930699915000 LALU SUKMA HIDAYAT
PEMBAYARAN 95%           117,669,850 1                         117,669,850
RETENSI               6,193,150 1                             6,193,150
23 PEMBANGUNAN JALAN LINGKUNGAN KELURAHAN GERUNUNG 602/11.F/BKM/PPK-APBDP/PERKIM/2018 17/11/2018 CV. MANGGALA JAYA TIWUGALIH PRAYA 316849264915000 L YUDISTIRA
PEMBAYARAN 95%           142,343,250 1                         142,343,250
RETENSI               7,491,750 1                             7,491,750
24 KONSULTAN PERENCANAAN PENATAAN LINGKUNGAN PAKET I 602/13.C/PRC-BKM/PPK-APBDP/PERKIM/2018 19/10/2018             59,697,000 1                           59,697,000 CV. FIFA CONSULTANT JANAPRIA LOTENG 839286333915000 MUSLEHADI, ST
35 KONSULTAN PENGAWASAN PENATAAN LINGKUNGAN PAKET II 602/14.C/PWS-BKM/PPK-APBDP/PERKIM/2018 17/11/2018             39,855,000 1                           39,855,000 CV KARYA TSALSABILA CONSULTANT MISPALAH PRAYA 707317103915000 JURAIMI HASYIM
26 PEMBAYARAN KONSULTAN PENGAWASAN PENATAAN LINGKUNGAN PAKET I 602/13.C/PWS-BKM/PPK-APBDP/PERKIM/2018 17/11/2018             49,843,000 1                           49,843,000 CV. FIFA CONSULTANT JANAPRIA LOTENG 839286333915000 MUSLEHADI, ST
HONOR KEGIATAN               8,000,000 1                             8,000,000
27 PENGADAAN DAN PEMASANGAN PJU JLN GURU BANGKOL (PRAPEN – SEMAYAN ) 602/11.F/FS-BKM/PPK-R/PERKIM/2018 30/07/2018 CV. HAMUN ABADI TEKNIK BARABALI BATUKLIANG 8382840367915000 HAYUN
PEMBAYARAN 95%             51,262,950 1                           51,262,950
RETENSI               2,698,050 1                             2,698,050
28 PENGADAAN DAN PEMASANGAN PJU JLN ANGSOKA ( PEGADAIAN – KUBURAN MALAYSIA ) 602/11.F/FS-BKM/PPK-R/PERKIM/2018 30/07/2018 PT. KARYA JAYADI MANDIRI NARMADA LOBAR 750508897914000 MUHAMMAD JAYADI
PEMBAYARAN 95%             88,155,250 1                           88,155,250
RETENSI 602/13.F/FS-BKM/PPK-R/PERKIM/2018 30/07/2018               4,639,750 1                             4,639,750
29 PERBAIKAN PJU RSUD  – JONTLAK PT. KARYA JAYADI MANDIRI NARMADA LOBAR 750508897914000 MUHAMMAD JAYADI
PEMBAYARAN 95%             95,023,750 1                           95,023,750
RETENSI               5,001,250 1                             5,001,250
30 PENGADAAN DAN PEMASANGAN PJU JLN  KI HAJAR DEWANTARA (LANJUTAN ) 602/12.F/FS-BKM/PPK-R/PERKIM/2018 30/07/2018 CV. KARYA SEMARANG TEKNIK GERUNUNG LOMBOK TENGAH 31558539915000 M AHDIYA
PEMBAYARAN 95%             71,064,750 1                           71,064,750
RETENSI               3,740,250 1                             3,740,250
31 PENGADAAN LAMPU LED PJU 602/02.C/PNGD-BKM/PPK-APBDP/PERKIM/2018 21/11/2018           157,460,000 1                         157,460,000 CV. GIAT USAHA JL YOS SUDARSO 17 PRAYA 11128121915000 LALU ISA NAZILA
32 PENGADAAN METERISASI PJU 602/01.C/PNGD-BKM/PPK-APBDP/PERKIM/2018 31/10/2018             99,758,000 1                           99,758,000 CV. KARYA SEMARANG TEKNIK GERUNUNG LOMBOK TENGAH 31558539915000 M AHDIYA
33 RASIONALISASI PENERANGAN JALAN UMUM ( PJU ) 602/09.F/FS-BKM/PPK-R/PERKIM/2018 22/10/2018 CV. KARYA SEMARANG TEKNIK GERUNUNG LOMBOK TENGAH 31558539915000 M AHDIYA
PEMBAYARAN 95%           156,597,050 1                         156,597,050
RETENSI               8,241,950 1                             8,241,950
KIB  D                      3,832,712,800
TOTAL PENGADAAN                13,566,923,517
KEPALA DINAS PERUMAHAN DAN KAWASAN PERMUKIMAN Praya, 2 Januari 20189
KABUPATEN LOMBOK TENGAH, PENGURUS BARANG,
LALU FIRMAN WIJAYA, ST.MT AGUS HERIYANTO
NIP. 19700504 200003 1 007 NIP. 19810827 20050 1 006

Comments are closed.

Scroll To Top